Chile: the balanced view : a recopilation of articles about the Allende years and after
5. Guayacan & Huas– co plants 6. Bocamina Plant 7. Gas turbines 8. Ventanas Plant 9. Tocopilla Plant 10. Various projects , Summary: Hydraulic power Thermal power Various works (Included under immediate ac– tion) 67,400 kW + 24,000 kW Thermal coal plant, 160,000 kW. 1975-79 Transmission lines & substations. Thermal plant with gas turbinas; 1975-76 5 units, 24.000 kW each. Plant for 120.000 kW. Thermal unit for 200.000 kW. 1974-78 Ineludes expansion of system. 2 units, 50,000 kW each or 1974-,76 100,000 kW, in addition to 2 units with 20,000 kW each. or 40.000 kW total are being in- stalled and last 2 units installed in 1970 are being reworked. ij Transmission & systems ii) Oistribution companies iii) Other projects 1974-80 1974-80 1974-80 49.3 39.1 16.9 20.0 50.5 33.0 '31.2 21.7 75.1 36.6 58.4 15.3 19.7 15.6 88.4 1978-79 Expansion of present plant with SEÍcond coal unit, 160,000 kW. 36.91975 83.5 Emergency program to avoid ra– tioning in centr¡¡1 zone !>f country. Second thermal unitrequired due to delay in hydroelectric projects. 52.9 1975-76 Partly the replacement of old in– stallations and partly expansion to cover growth of copper and nitrate mining. 90.4 56.3 74.0 Includes group of various, iNorks that represent small installations, supplementary research, and social, works. 902.6 340.5 1.243.1 1,340.000 kW 871.000 100.000 2,311,000 kW Power to be installed would practically duplicate the present supply during the theo– retieal period 1974-80 (7 years). In fact, this figure corresponds to the delay due to nonconstruetion of important works during 1970'-73 and furtheonore, to the part of the power that will be added dur.ing 1981 -86. ' ~es not inelude energy that inight be obtained from some exceptional programo such as prOduction of aluminum.
Made with FlippingBook
RkJQdWJsaXNoZXIy Mzc3MTg=